Modernization of 42 Units of the MAN Train Fleet for the Medellin Metro.
Outcome
Delivery of modernized unit.
Process:
Enable and verify the correct distribution of different types of voltage and equipment installations in the unit.
Uncoupling and disassembly of the unit underframe, in the department, and cabin.
Cleaning and decontamination of the unit's exterior and interior.
Assembly of: doors, windows, flooring, ceilings, electrical wiring, conduit, panels in department, underframe, and cabin.
Modernization of traction system, auxiliary equipment, and replacement of control and power wiring.
Testing of pneumatic valves and braking systems.
Maintenance of electromechanical systems.
Load and slip tests.
Tuning, static, and dynamic tests.
After modernization: Verify and enable auxiliary systems and user information systems.