Modernization of Medellin Metro trains

Modernization of 42 Units of the MAN Train Fleet for the Medellin Metro.

Outcome
Delivery of modernized unit.

Process:

  • Enable and verify the correct distribution of different types of voltage and equipment installations in the unit.

  • Uncoupling and disassembly of the unit underframe, in the department, and cabin.
    Cleaning and decontamination of the unit's exterior and interior.

  • Assembly of: doors, windows, flooring, ceilings, electrical wiring, conduit, panels in department, underframe, and cabin.

  • Modernization of traction system, auxiliary equipment, and replacement of control and power wiring.

  • Testing of pneumatic valves and braking systems.

  • Maintenance of electromechanical systems.

  • Load and slip tests.

  • Tuning, static, and dynamic tests.

  • After modernization: Verify and enable auxiliary systems and user information systems.

  • Delivery of a modernized unit for commercial use.